Downtime message
Due to planned maintenance taking place on Thursday 9th October between 9:00 AM and 1:00 PM, services might be disrupted or temporarily unavailable. We apologise for any inconvenience.
Adrodd fel Amhriodol
Testun Gwreiddiol (Anodiad: SPW027211 / 1454345)
'
Harbour Rail Swing Bridge.
The Harbour Swing Bridge is powered by a Bruce Peebles 440 Volts 50 Hz 3 Phase 8 pole 750 RPM induction motor through a gear train.
There is trapdoor between the rail tracks which can be lifted by a mobile crane, although it is possible to remove it through a side door in the body of the bridge.
'