Report content as inappropriate


Original Text (Annotation: SPW050796 / 1341057)

' Coaling Hoist called the "High Level" 23ton Hydraulic, 20ft Chute, fixed position Location: No 2a Berth Coal waggons entered at quay level from the rail track on the dock side The elevator raised the waggon and positioned at the chute After the coal was tipped into the ship the waggons exited on the (RHs photo) ramp to ground level '